LAV6 Patch

Availability: In stock (12)
Brand: Custom Patch Canada

In July 2009, the Canadian Department of National Defence announced that $5 billion would be spent to enhance, replace and repair the Army's armoured vehicles. Part of the spending would be used to replace and repair damaged LAV III's due to wear and tear from operations in Afghanistan. As many as one third of the Army's light armoured vehicles were out of service. The LAV III's will be upgraded with improved protection and automotive components. The Canadian Armed Forces has lost over 34 vehicles and 359 were damaged during the mission in Afghanistan. The Canadian Army has lost 13 LAVs and more than 159 were damaged by roadside bombs or enemy fire. Of the $5 billion announced, approximately 20% of it will be used to upgrade LAV III models. The upgrade will extend the LAV III life span to 2035. The remaining $4 billion is to be spent on a "new family of land combat vehicles". The Department of National Defence considered the purchase of vehicles meant to accompany the Leopard 2 and to sustain the LAV III into combat. The CV90, the Puma (IFV) and the Véhicule blindé de combat d'infanterie were the most likely candidates for the role. A contract of 108 with an option for up to 30 more was considered, but a combination of budget cuts and upgrades to the existing fleet of LAV IIIs have led the Canadian Army to cancel its order for 108 CV90s.

In October 2011, the Canadian government announced a $1.1 billion contract to General Dynamics Land Systems to upgrade 550 LAV III combat vehicles. The government said the upgrade is needed to improve protection against mines and improvised explosive devices (IEDs), which have been the cause of a number of Canadian deaths in Afghanistan. The improvements will also extend the service of the vehicles up to 2035 and will boost troop mobility. The upgrades include a new and more powerful engine, increased armour protection, steering and brake systems. The turret hatches on the LAV III would be made larger and improved fire control, thermal, day and low-light sights, and data displays. The weight of the vehicle would increase from 38,000 pounds (17,000 kg) to 55,000 pounds (25,000 kg). The first of 66 upgraded LAV IIIs was delivered on February 1, 2013. The success of the upgrade program and budget pressures led to the cancellation of the Close Combat Vehicle replacement program later that year.

In September 2012, the original contract valued to at $1.064 billion to upgrade the 550 LAV III's variants, an infantry section carrier, a command post, an observation post and an engineer vehicle to the LAV 6 configuration, was modified. This included an additional $151 million to upgrade 66 LAV III's to the LAV 6 with a LAV Reconnaissance and Surveillance System (LRSS) fitted.

In February 2017, GDLS – Canada was awarded a $404 million order to work on 141 LAV Operational Requirement Integration Task (LORIT) vehicles. This contract will upgrade the remaining LAV III fleet in the Canadian Army to the LAV 6 configuration. This brings the Canadian Army's LAV III Upgrade (LAVUP) program to a total cost of $1.8 billion.

Final completion and delivery of the Canadian Army's LAV III Upgrade (LAVUP) to upgrade the LAV III to the LAV 6 was expected to be completed by December 2019.


Made of the best quality PVC, this design mesure 2,25'' high and 3,75'' wide. This patche come with velcro hook backing for easy carry on any loop velcro.

0 stars based on 0 reviews
Please accept cookies to help us improve this website Is this OK? Yes No More on cookies »